Although it can be concluded in many ways that all business paths lead to Sveti Nedelja (or at least a large part of them), the path of PIA Automation Croatia (PIACRO) leads in another direction – from the Sveti Nedelja locality of Novaki to the other side of the metropolis, to the suburban area of Sesvetski Kraljevec in Zagreb.
In a business zone with several companies that mainly have warehouse spaces, two production halls of PIACRO are also located. We found two key people, director Matjaž Žižmond and engineering director and procurator Marin Bilandžija, in the midst of the relocation. Although access to the facility is currently via provisional ladders, it is clear at first glance that we are in the center of high technology, among robots, computers, and the most modern PLC machines. Here, we learn, are also parts of automotive electric motors and various powertrain assemblies of top brands that undesirable eyes – including journalistic, let alone competitive – must not see.
– We deal with everything – from the development of automated line designs in the automotive industry to the production of parts, assembly, testing, and commissioning at the client’s site – explains Žižmond this company’s one-stop. Bilandžija adds that line automation involves mechanical and electrical design, PLC programming, and assembly on a ‘turnkey’ basis.
In a more liberal journalistic interpretation, PIACRO receives from the client a powertrain assembly specifically developed for the engine of a new car model. Then they design a line for serial production for that assembly and set it up in their hall, and when the client is satisfied, they dismantle that line and reassemble it where production will take place. This means that Žižmond, Bilandžija, and their team know almost before anyone else what the strongest global car brands are preparing in their new models that are yet to hit the market.
– Yes, we know, but we don’t talk about it – they respond in unison and reveal that in this business, in addition to high technology, absolute trust is also required. Therefore, security measures are at the highest level. Since the office section is not yet operational, we sit at a makeshift office table in the middle of the facility, but under the watch of several cameras. We are monitored by the most modern electronic surveillance, and there is also additional physical security.
We assume that because of this, they can only work for one client at a time, but we are immediately contradicted. It is planned that the hall can be partitioned not only by physical barriers but also separated by sound insulation, so the trained ear of an automotive engineer cannot hear even the revving of a competitor’s engine.
For this reason, they need a larger space than the thousand square meters they currently have in Novaki. And it was not at all simple to find land for 3000 square meters of halls and 1000 square meters of offices. Therefore, they opted for this location where there are already two halls of 1700 square meters each and 1200 square meters of offices, with the option to rent a third hall as well as additional office space.
